Date: 2017-03-02
Project Overview
- Project Name: Project No. PW11703392
- Location: Thailand
- System Process: Per the existing system design (expansion scope)
- Production Capacity: Expansion of the existing pure water system (Phase 1.5)
- Water Quality Standard: Per the existing ultrapure system design
Client Profile
The end client is a leading global photovoltaic manufacturer, one of the top names in solar cell and module production, with an overseas manufacturing base in Southeast Asia. Ultrapure water is essential to cell and wafer processing, where water purity directly affects conversion efficiency and product yield.
In accordance with the client’s confidentiality requirements, the customer name is withheld in this case study and the project is referenced by its contract number.
Technical Note: Process Terms
This contract scope covers the supply of a packaged pure/ultrapure water system. Typical ultrapure water trains combine filtration stages, reverse osmosis, electrodeionization and mixed-bed polishing to reach the required purity. Contact us for the detailed process design of this project.
Project Location: Thailand | System process: Per the existing system design (expansion scope) | Date: 2017-03-02
“