Project Title: Project PW1251023745 — Groundwater Treatment System (4×110 T/H)
Date: 2025-10-01
Project Overview
- Project Name: Project No. PW1251023745
- Location: Ethiopia
- System Process: MMF + ACF
- Production Capacity: 4×110 T/H (440 T/H total)
- Water Quality Standard: Pretreated groundwater for plant process water
Client Profile
The end client is a global PV manufacturer building new cell capacity in Ethiopia; the contract is executed by a Chinese engineering and construction contractor active in the African PV market.
In accordance with the client’s confidentiality requirements, the customer name is withheld in this case study and the project is referenced by its contract number.
Technical Note: Process Terms
For your reference, here is a breakdown of the technical process mentioned:
- MMF: Multi-Media Filter — removes suspended solids and turbidity from feed water through layered filtration media (anthracite, sand and garnet).
- ACF: Activated Carbon Filter — removes residual chlorine, organic matter, color and odor to protect downstream membranes and ion-exchange resins.
Project Location: Ethiopia | System process: MMF + ACF | Date: 2025-10-01
“